Broadway Street Reconstruction
$17.3M bond project replacing aging brick between Avenues Q and E with concrete and modern brick pavers, underway in phases through the two-year build.

For Lubbock-area contractors, subcontractors, and suppliers who haven't been paid for their work.

$17.3M bond project replacing aging brick between Avenues Q and E with concrete and modern brick pavers, underway in phases through the two-year build.

Widening from two to five lanes between 34th and 50th Streets, with planning underway to extend the project south toward 98th Street.

Ongoing TxDOT and city work on the Loop 88 routing project and the US 87/FM 41 bridge rehabilitation.

A new downtown green space with a concert stage and family zones, built by Teinert Construction, targeting late 2026/early 2027 completion alongside the Broadway Market development.

A 671-unit student housing community on the Texas Tech campus, built by Teinert Construction, targeting a Fall 2027 opening.

A new H-E-B and fuel station on 19th Street (late 2027) alongside a $46M distribution facility at 407 Lubbock Business Park Blvd. (mid-2027).
Big project or small, every contractor and supplier on these jobs is working under the same Chapter 53 deadlines.
Texas has some of the most technical mechanics lien deadlines in the country under Chapter 53 of the Texas Property Code. Missing a deadline can mean permanently losing your right to payment — regardless of how much you're owed or how clear the debt is. This applies to contractors and suppliers in Lubbock just as strictly as anywhere else in the state.
Enter your details, then press the button to see your key Texas deadlines.
One price. No hourly billing. Your flat fee includes:

Lubbock sits at the center of the South Plains — a mix of downtown revitalization, Texas Tech-driven growth, major road and bond projects, and the agricultural and wind-energy activity that shapes the wider region. Liens for Lubbock-area projects are recorded with the Lubbock County Clerk. Texas Lien Law Firm handles the notices, filings, and paperwork so Lubbock contractors and suppliers can focus on their work, not the legal process.
Article XVI, §37 of the Texas Constitution grants lien rights to mechanics, artisans, and material suppliers. Chapter 53 of the Texas Property Code sets out the procedures that make those rights enforceable.
Original contractors, subcontractors, suppliers, specialty fabricators, and certain design professionals who furnish labor or materials for improvements to real property.
Residential projects carry shorter deadlines and extra requirements, including specific statutory notice language and protections for homestead property.
Subcontractors and suppliers must send notice to the owner and original contractor (§53.056) before filing. The affidavit must meet §53.054 content rules, be filed by the §53.052 deadline, and be served per §53.055–§53.057, including notice of retainage claims under §53.057.
We verify all of the information so your lien holds up.
For projects begun on or after January 1, 2022, the lien affidavit generally must be filed by the 15th day of the fourth month after the month your work was completed (the third month on residential projects). Subcontractors and suppliers must also send notice by the 15th day of the third month after each unpaid month (the second month on residential).
Our flat fee is $599 and covers the pre-lien notice, preparation of the lien affidavit, and filing. County recording fees charged by the Lubbock County Clerk are separate.
The lien affidavit is recorded in the real property records of the Lubbock County Clerk. Copies must also be sent to the owner and, where required, the original contractor.
No — public property can't be liened. On public projects such as TxDOT roadwork or city bond projects, your protection is a claim against the contractor's payment bond under Chapter 2253 of the Texas Government Code, which has its own notice deadlines. We handle those claims too.
No law requires one, but Chapter 53 is unforgiving about deadlines, notice content, and property descriptions. A defective or late filing can be invalid.
Suppliers and subcontractors can still have lien rights, but only if the required notices are sent on time. That's why the notice deadlines matter as much as the filing deadline.
The lien appears in the public records, which often prompts payment. If not, it must be enforced by lawsuit — generally within one year (residential) or two years (commercial).